Technical Construction File

A number of EU directives require a "Technical- Design review records
Construction File" to be maintained and to beAn extremely difficult decision is when to start
available as part of their documentarythe creation of the TCF. From an engineering
requirements. Two examples are the Lowperspective it is preferable to defer the creation
Voltage and R&TTE directives. While theuntil the first production batch is to be
directives place specific requirements on themanufactured, as only then is the design likely to
contents of the Technical Construction File (TCF)be stable. However in terms of capturing and
there are some general principles that areprotecting the businesses investment into product
common throughout. The TCF is a document orIntellectual Property (IP) the pressure is to start
series of documents that contain the full technicalthe TCF on the first day of the project. We have
details of a product, and it is usually required tofound that in most cases the best timing is
have a unique serial number. At a minimum theimmediately following the release of the Alpha
TCF should contain the following information:prototyping phase. Although the design is not yet
- Table of contentsstable it is critical to carefully control engineering
- Design calculations and tradeoffschanges from this point and into production and a
- Bill of Materialsrigorous approach to documentation is natural at
- Electrical schematicsthis point.
- PCB layoutsAny technically competent member of staff is
- Mechanical design details including enclosurecapable of compiling the TCF, although it is better
materials if applicableto have someone who is not intimately involved in
- Test results for both internal and "approvals"the design and development process. If your
related testscompany has a Quality Manager they would make
- User Manualthe ideal candidate, as it is an excellent
- Certificate of Conformanceopportunity to audit the design and its associated
In addition to the above I would recommenddocumentation. Where a company does not have
adding the following for completeness:the resource an independent third party can be
- Software source code and project filesused. However the TCF contains extremely
- Assembly photographs and detailsvaluable information and suitable contractual
- Change notes and revision change history.protection should be put in place.